Yard work in Naperville. What the city wants first.

Front yard and backyard. Permit when the city says so, then one crew. Pulled from live City of Naperville pages in September 2026.

Check with the city — rules change. This is not legal advice. HOA rules can be stricter. Unincorporated / Wheatland Township lots may go through Will County, not City of Naperville. TED: (630) 420-6100.

Front yard

Driveway and apron

New or expanded driveways need a permit and have to meet zoning. Show the change, dimensioned, on a copy of the legal plat of survey. Decorative aprons (brick pavers, stamped or colored concrete) need a right-of-way encroachment agreement. Source: driveway permit.

Public sidewalk

Replacing or installing sidewalk in the right-of-way is a driveway / sidewalk permit, not a DIY weekend. Concrete in the apron or public sidewalk can only be poured April 15 through November 15. Details on the concrete page.

Fence

The city has a dedicated fence permit. Do not assume a like-for-like swap is skippable. Source: fence permit.

Irrigation

Lawn sprinklers need a permit, including the RPZ backflow preventer. Source: lawn sprinklers / RPZ.

Backyard

Deck

Any elevated deck needs a permit. So does replacing beams, joists, stairs, or railings. Lighting or receptacles can ride on the same deck permit. Source: deck, patio, and shed.

Patio

Permit if total paved area will exceed 500 square feet. Any patio still needs one if it has a permanent fire pit, fireplace, or grill, is more than 30 inches off the ground, or has electric, plumbing, or gas. Source: same deck / patio page.

Sport court

Always a permit, any size. Still follow setbacks and easements.

Shed, arbor, gazebo

Live page talks about secondary structures. The 2022 PDF said sheds over 150 sq ft. Call TED before you order the kit.

Pool or spa

Permit for a pool or spa deeper than 24 inches. Source: swimming pool permit.

Retaining wall

The 2022 PDF said walls over three feet. That number is not on the live pages we checked. Call TED. Do not guess.

File in the Civic Access portal (desktop). Process lives on Building permits. Print the permit and post it where it is visible from the street. We do not list fees — they change.

Get the Landscaping name

Permit first, then one crew. Tell us the job. We write back with who to call.

We’ll write back with the name. No spam.

Got it. We’ll write back with the Landscaping name.

One name when you need the work. Not a pile of quotes.

If they waste your time, we replace them.